铸造工艺 | 压铸 |
材质等级 |
GB, ANSI, BS, DIN, JIS, ASTM, ASME, AISI等 铝合金:ISO3522-84、ASTMB85-96、JISH5302:2000、EN1706:1998 Adc12, adc10, a360, a380, a356, 6061, 6063 2.镁合金:ISO/DIS16220-1999, ASTMB93/B93M-98, EN1754-1997 镁合金:AZ91D, AM60B, 3.锌合金:ISO301-1981,ASTMB327-98, jish201:1999, EN12844:1998 锌合金:ZA3 #, ZA5 #, ZA8 # |
公差 | ±0.02mm |
一般性铸造公差 | ISO 8062 , 或者与客户协商 |
设计软件 | UG, Pro-E, Inventor |
模具制造 | Yes |
铸造模拟 | Yes |
质量体系 | ISO 9001 |
最高加工公差 | 0.005mm |
加工粗糙度 | Ra0.8-Ra3.2,或者客户要求 |
热处理 | 正火,退火,淬火和回火,表面硬化,氮化,碳氮化,感应淬火,等 |
表面处理 | 喷砂,抛光,酸洗钝化,电镀,电泳,静电喷涂,镀铬等 |
Q1. Are you a factory or a trade company?
A: We are a factory with over 14 years of casting, forging, fabrication and machining. We service customers in various fields, such as mining, agriculture, car parts, etc.
Q2. Where is your factory?
A: Our factory is located in Dandong City, Liaoning Province, which is close to Dalian port within a 1 hr drive.
Q3. How to quote?
A: Received the sample or drawing in CAD STP form, then we will make the quotation.
Q4. How about the MOQ?
A: Depend on the weight and material, if it is our daily melting material, there is no MOQ.
Q5. Payment terms
A: Mold costs: 50% deposit,, balance after sample approval
Mass production: 50% deposit, balance upon B/L available.
Q6. Delivery time
A: Normally 25-40 days, but it depends on the part.
Q7. How about the packing?
A: Standard or customized will both be available. We will consider the transfer at warehouse and long time anti rust while on the sea.
Q8. How can I get more information?
A:If you need more information, you can send email to info@leesh.cn. If you need any instant answer, please call 0086-135-1608-5845. Thanks.
联系人:Betty Cao
手机:+86 138 4009 6762
电话:+86 138 4009 6762
邮箱:info@leesh.cn
地址: 辽宁省沈阳市沈北新区蒲丰路97号